Renovations · Luxury Condo Renovations

Luxury Condo Renovations.

High-rise remodels the board actually approves. Full-interior condo renovations delivered inside your building’s elevator windows, noise hours, and common-area rules — without a single mid-project schedule change. Eight-to-twenty-week typical scope.

What's included · what's not

The full condo-remodel scope in writing before board submission.

Condo work isn’t just a renovation — it’s a renovation inside a building with rules. The fixed-bid names every scope line, every elevator reservation window, every off-hours ask, and every common-area protection measure. Timeline: 8–20 weeks typical.

Included in the fixed bid

  • Existing-conditions unit walk-through
  • Full board application + rules-of-work packet
  • Insurance certificates naming the association
  • Permit drawings + city / county submissions
  • Reserved service elevator + pad-up
  • Common-area floor + wall protection
  • Noise-hour sequencing (9–4 typical)
  • Neighbor-notice letters
  • Full demo + haul-out via service elevator
  • Kitchen, bath, MEP rough-in, cabinetry, stone, tile, millwork
  • Daily hallway sweep + damage inspection

Not included (transparent)

  • Building assessment fees (paid to HOA directly)
  • Fixture / appliance purchase (installed only)
  • Impact-glass window replacement (separate spec)
  • Structural work outside your unit’s footprint

Timeline

8–20 weeks typical. Cosmetic refreshes on the shorter end; full-interior remodels with structural moves on the longer. Committed in writing at signing — not adjusted mid-project when the board tightens elevator rules.

License stack

  • General Contractor · FL #CGC1525289
  • Plumbing Contractor · FL #CFC1434398
  • Electrical Contractor · FL #EC13015530
  • Mechanical Contractor · FL #CMC1251666
Why owners pick Dellamano for condo work

The reason your board approves the application on round one.

01Board-fluent office

Kiersten prepares the full application packet — insurance COIs, licensing, rules acknowledgment, scope drawings — before it hits your desk to sign.

02Every trade on one crew

MEP work happens on the same elevator reservation as demo and finish — no re-scheduling the electrician for a separate week the plumber cannot make.

03Common-area protection built in

Reserved service elevator with quilted pads, adhesive floor film in every walk path, damage inspection with building management pre- and post-job.

04One warranty conversation

Your board keeps one contractor on file. When a question comes up later, one signature answers — not a rotating cast of subs.

Frequently asked

Luxury Condo Renovations · the questions Aldo answers every week.

Do you handle the condo board application and rules-of-work package?

Yes. Our office prepares the full board application — insurance certificates naming the association, contractor licensing packet, scope drawings, rules-of-work acknowledgment, waste-removal plan, and neighbor-notice letters. Most boards approve on the first submission.

Can you work within a building’s noise-hour and elevator restrictions?

That’s the norm for our condo work. Most buildings restrict noisy trades to 9 AM–4 PM weekdays and prohibit weekend work. Sequencing demo, MEP rough-in, and finishes inside those windows is part of the fixed-bid schedule — no request for schedule relief mid-project.

How do you protect elevators, lobbies, and hallways during a condo renovation?

Reserved service elevator with quilted pads and floor protection at every arrival. Common-area walk paths lined with adhesive floor film. Elevator vestibule and hallway between the unit and the elevator swept clean at the end of every workday. Damage inspection with building management before and after.

What’s the realistic timeline for a full high-rise condo remodel?

Eight to twenty weeks depending on scope. A 2,000 sqft two-bedroom cosmetic refresh: 8–10 weeks. Full-interior kitchen + bath + flooring + millwork on a 3,500 sqft unit: 14–18 weeks. Structural moves inside a load-bearing high-rise slab: add 2–4 weeks for engineering and board sign-off.

More scopes under one contract

Other renovation expertise often paired with a condo remodel.

Luxury Condo Renovations · under one contract

Fixed price at signing. Delivered on the day committed — inside your building’s rules.

Tell us the building and the scope. You’ll promptly have a walk-through scheduled and a path to the board packet.

Luxury Condo Remodeling Built Around Your Building's Rules

Dellamano Construction delivers full-interior high-rise remodels across South Florida's Broward and Palm Beach corridors — with board applications prepared before you sign and a schedule that never shifts mid-project.

Why South Florida High-Rise Remodeling Is a Different Animal

Condo remodeling in Broward and Palm Beach counties operates under a layer of rules that standard residential work never encounters. Most associations along the Intracoastal and barrier-island corridors enforce noise windows tighter than city code — commonly 9 AM to 4 PM on weekdays with full weekend bans — and reserve the right to revoke elevator access on short notice during building events or hurricane-season preparation cycles.

Florida's coastal building stock also introduces permit complexity that inland projects skip. Units in high-rises built before the mid-1990s frequently require asbestos surveys prior to demo, and Miami-Dade and Broward building departments both maintain separate high-rise permit tracks with extended review queues compared to single-family submittals. Work inside the unit's plumbing stack can trigger mandatory association plumber inspections at rough-in — a step that has to be sequenced into the elevator window before drywall closes.

Dellamano's office prepares the full compliance packet — scope drawings calibrated to association rules, insurance certificates naming the HOA, licensing documentation, and waste-removal plans that satisfy both the building and the county — so the board sees a submission that reads like it was written by someone who has done this before, because it was.

What a Luxury Condo Remodel Actually Covers — and What Moves the Timeline

A full-interior luxury condo remodel typically spans kitchen, primary and secondary baths, flooring, millwork, MEP rough-in updates, and finish carpentry — all delivered inside the building's elevator and noise constraints without a separate mobilization for each trade. When every licensed trade works on the same crew under one contractor license stack, there is no week lost waiting for the electrician to rebook after the plumber's rough-in runs long.

Timeline is driven by two variables: scope depth and board cycle time. Cosmetic refreshes in a two-bedroom unit — new cabinetry, countertops, tile, and paint — typically resolve on the shorter end of the eight-to-twenty-week window the fixed bid commits to. Full structural reconfigurations that relocate walls or wet areas sit toward the longer end, not because the work is slower but because permit drawings and association review add lead time that cannot be compressed. That lead time is mapped out in writing at signing — not discovered mid-project.

Common questions

How do I know the condo board will approve the renovation before work starts?
The application packet Dellamano's office submits — insurance certificates naming the association, the full contractor license stack, scope drawings, rules-of-work acknowledgment, waste-removal plan, and neighbor-notice letters — is assembled to match the specific building's submission requirements before it reaches your desk to sign. Most boards approve on the first submission because the packet anticipates the checkboxes they use to reject incomplete applications. If a board requests a revision, the office handles it without it becoming your project management task.
What happens to my elevator access and building schedule if the remodel runs long?
The elevator reservation windows, noise-hour sequencing, and project milestones are committed in writing at signing — not adjusted later when the board tightens access during a busy building period. If a weather event or permit delay affects the critical path, the schedule impact is communicated immediately and the downstream reservation windows are renegotiated with the building, not handed back to the owner as their problem to solve.
Can the same contractor handle kitchen, baths, electrical, and plumbing — or will I be coordinating multiple crews?
Dellamano holds general contractor, plumbing, electrical, and mechanical licenses under one entity, which means MEP rough-in happens on the same elevator reservation as demo and finish work — no rebooking a separate licensed subcontractor for a week the other trades cannot make. For a high-rise remodel where each elevator access window is a finite resource, consolidating every trade under one license stack is the practical difference between an eight-week project and one that drifts past twenty.

Schedule a Unit Walk-Through

Bring the building's rules-of-work packet to the walk-through and leave with a scope outline the board can actually approve.

Call (561) 654-7243

Text Aldo Call the office