Spa-Inspired Bathroom Remodeling.
Freestanding tubs. Curbless walk-in showers. Book-matched stone. Master baths and powder rooms built with in-house plumbing and electrical, priced fixed at signing. Four-to-eight-week typical scope.
The full spa-bath scope in writing before we start.
A bathroom looks simple. Behind the tile there’s waterproofing, drain slope, dedicated circuits, GFCI, and vent stack rework. Every line lives in the fixed-bid proposal — nothing hides behind “allowance TBD.” Timeline: 4–8 weeks typical.
Included in the fixed bid
- Existing-conditions site visit
- Permit drawings + HOA approvals
- Full demolition + haul-off
- Drain / supply relocations
- Dedicated circuits + GFCI
- Waterproofing (Schluter or comparable)
- Tile setting (walls, floor, shower niche)
- Cabinetry + stone countertop
- Freestanding tub / walk-in shower
- Fixture install (owner-supplied welcome)
- Optional radiant floor heat
Not included (transparent)
- Fixture purchase (installed only)
- Custom vanity mirror supply
- Structural changes not on drawings
Timeline
4–8 weeks typical. Powder rooms on the shorter end; large master baths with structural moves on the longer. The exact window is committed in writing at signing.
License stack
- General Contractor · FL #CGC1525289
- Plumbing Contractor · FL #CFC1434398
- Electrical Contractor · FL #EC13015530
- Mechanical Contractor · FL #CMC1251666
The reason a spa bathroom actually feels like one.
01Plumbing + electrical in-house
Drain moves, dedicated circuits, and GFCI adds are self-performed under Aldo’s own trade licenses — not sub-of-a-sub.
02Real waterproofing
Full membrane systems (Schluter or comparable) — not the “paint the drywall and pray” approach that fails at year three.
03Fixed-bid, never T&M
Every line signed at contract. No allowance games. Change orders require your signature before any work happens.
04One warranty conversation
One contractor, one signature, one number to call if a fixture leaks or a tile shifts later.
Bathroom Remodeling · the questions Aldo answers every week.
How long does a typical South Florida bathroom remodel take?
Four to eight weeks from demo to final walkthrough. Master baths on the longer end, powder rooms on the shorter. Every fixed-bid commits to a specific window in writing.
Do you handle relocating plumbing and electrical for a new bathroom layout?
Yes. Because Aldo personally holds Florida’s Plumbing (CFC1434398) and Electrical (EC13015530) licenses, drain relocations, new water lines, dedicated circuits, and GFCI additions are priced into the fixed bid and self-performed.
Can you build a curbless walk-in shower on a slab foundation?
Yes. Curbless showers on slab require either recessed drainage (cut into the slab and re-poured) or a raised finish floor across the room. Both approaches are engineered and permitted.
Do you install radiant floor heat in South Florida bathrooms?
Regularly. Electric radiant mat under stone or porcelain tile is common in master baths — the tile is otherwise cold on winter mornings. Wired to a dedicated circuit and programmable thermostat.
Other renovation expertise often paired with a bathroom remodel.
Real projects. Real trades. One signature on every permit.
A cross-section of recent Dellamano Construction Inc. master baths, powder rooms, and spa showers across Broward and Palm Beach counties.

Walk-in shower with glass enclosure, gray tile surround, and river-stone floor detail.

Marble vanity with dual sinks, brass fixtures, and walk-in shower in a custom home master bath.

Spa-inspired master bath with curved stone lounger and dual walk-in closets.

Marble finishes with curved neon lighting, freestanding tub, and dual vanity.

Marble flooring, freestanding tub, walk-in shower, and contemporary fixtures.

Freestanding white tub, marble flooring, mosaic accent wall, custom vanity.

Walk-in shower with wood-look tile and frameless glass enclosure.

Dual vanity, marble countertop, and custom cabinetry.
Fixed price at signing. Delivered on the day committed.
Tell us about the bathroom scope. Within one business day you’ll have a walk-through scheduled and a path to a written proposal.
