Renovations · Custom Cabinetry & Built-Ins

Custom Cabinetry & Built-Ins.

Kitchen cabinets. Wine walls. Media walls. Closet systems. Rift oak, walnut, painted MDF, high-gloss lacquer. Integrated lighting, soft-close hardware, appliance-ready openings — drawn, built, and installed under one signature.

What's included · what's not

The full cabinetry scope in writing before we cut a single door.

Millwork is where a job stops feeling “good” and starts feeling luxury. Every material, every hinge brand, every LED strip is spec’d in the fixed-bid proposal — nothing hides behind “stock cabinets, TBD.” Timeline: 4–10 weeks shop + 1–2 weeks install.

Included in the fixed bid

  • Field-measure + laser layout
  • Elevations, section details, hardware schedule
  • Shop fabrication (rift oak, walnut, painted MDF, lacquer)
  • Blum / Häfele soft-close hardware
  • Undermount full-extension drawer glides
  • Push-latch or pull hardware per design
  • Integrated LED strips (uppers, display, closet)
  • Dedicated dimmable circuit for cabinet lighting
  • Appliance-ready openings + vent coordination
  • On-site scribe, trim, and touch-up

Not included (transparent)

  • Appliance purchase (installed only)
  • Stone countertop (separate line, coordinated)
  • Finish hardware if owner-supplied (installed only)

Timeline

4–10 weeks in the shop, then 1–2 weeks on site for install, scribe, and trim. Painted MDF and stock species on the shorter end; matched-grain walnut or exotic veneers on the longer.

License stack

  • General Contractor · FL #CGC1525289
  • Electrical Contractor · FL #EC13015530
Why owners pick Dellamano for cabinetry

The reason a wall of built-ins actually reads as one piece.

01Real shop drawings

Elevations, section details, and a hardware schedule you sign off on before a single sheet of plywood is cut. No “we’ll figure it out on site.”

02Hardware named on the bid

Blum, Häfele, and specific pull SKUs by number — not “quality soft-close.” What we specify is what shows up.

03Electrical + LED in-house

Cabinet lighting needs a dedicated dimmable circuit. Because Aldo holds the Electrical Contractor license (EC #13015530), it’s in the bid — not a change order later.

04One warranty conversation

Cabinetry + electrical + finish under one signature. No shop-vs.-installer finger-pointing when a drawer sags at year two.

Frequently asked

Custom Cabinetry · the questions Aldo answers every week.

What’s the lead time on custom cabinetry after signing?

Four to ten weeks in the shop, then one to two weeks on-site for install, scribe, and trim. Painted MDF and stock-species doors are on the faster end; rift oak, walnut, and exotic veneers with matched grain sequencing are on the longer end. The exact ship date is committed in writing at contract.

Do you draw the cabinetry or work off my designer’s shop drawings?

Both. If you’re working with a kitchen designer or architect, we build to their approved shop drawings. If you’re not, we produce elevations and section details for your sign-off before anything is cut. Either way, the doors, drawers, hardware, and finishes are named in the fixed bid.

What hardware do you specify for high-end cabinets?

Blum or Häfele soft-close for hinges and drawer slides on every drawer and door as standard. Undermount full-extension drawer glides. Push-latch on handleless designs. Integrated LED strips under uppers and inside display uppers, run to a dedicated dimmable circuit.

Can you integrate appliances and refrigeration into a built-in wall?

Yes — Sub-Zero column refrigerators, Wolf ovens, wine columns, coffee stations, ice makers, and undercounter refrigeration are common in our media walls and butler’s pantries. We coordinate the plumbing rough-in, dedicated circuits, and vent runs before the cabinets go in.

More scopes under one contract

Other renovation expertise often paired with custom cabinetry.

Custom Cabinetry · under one contract

Fixed price at signing. Delivered on the day committed.

Tell us the wall, the room, or the whole kitchen. Within one business day you’ll have a field-measure scheduled and a path to shop drawings.

Text Aldo Call the office