Umbrella · Expertise 16 of 18

General Contracting

The umbrella that covers every scope above. One fixed-bid contract, one signature, one accountable licensed contractor from estimate through final inspection.

What's included · what's not

The full scope in writing before we start.

Nothing hides behind “allowance TBD.” The fixed-bid proposal lists every line the way it’s going to appear on the invoice. Timeline: Scope-dependent.

Included in the fixed bid

  • Written fixed-bid proposal
  • Permit signing + submissions
  • Trade coordination across all divisions
  • Scheduling + inspections
  • Warranty administration

Not included (transparent)

  • Change orders outside signed scope (written approval required)

Timeline

Scope-dependent. The exact window is committed in writing at contract signing.

License stack

  • General Contractor · FL #CGC1525289
  • Roofing Contractor · FL #CCC1335157
  • Mechanical Contractor · FL #CMC1251666
  • Plumbing Contractor · FL #CFC1434398
  • Electrical Contractor · FL #EC13015530
Why this scope, done under one contract

The reason Dellamano projects finish on the day committed.

01All five licenses, one owner

General, Roofing, Mechanical, Plumbing, and Electrical — every one held personally by Aldo Dellamano.

02Fixed-bid or cost-plus, always in writing

Every project on a written contract — fixed-bid or transparent cost-plus — signed before work starts. No allowance games.

03Self-performed trades

Because we hold every license in-house, structural, MEP, and finish stay on the same schedule.

04One warranty conversation

One contractor, one signature, one number to call when questions come up later.

Frequently asked

General Contracting · the questions Aldo answers every week.

What makes a "general contractor" different from a specialty trade?

A GC signs the overall permit and takes responsibility for the entire project — not just the trade they self-perform. Aldo's unusual because he holds every specialty trade license too.

More scopes under one contract

Other expertise often paired with General Contracting.

General Contracting · under one contract

Fixed price at signing. Delivered on the day committed.

Tell us about the general contracting scope. You’ll hear back promptly with a walk-through scheduled and a path to a written proposal.

South Florida General Contractor With Every Trade License In-House

Dellamano Construction Inc. covers the full project — permit to final inspection — under one fixed-bid contract signed by owner Aldo Dellamano, serving Broward and Palm Beach counties since 2005.

What Hiring a General Contractor in Broward & Palm Beach Actually Involves

South Florida's permitting environment is among the most layered in the country. Broward County Building Division and the Palm Beach County Building Division each maintain their own inspection queues, impact-fee schedules, and wind-load documentation requirements tied to the Florida Building Code's High-Velocity Hurricane Zone provisions. A general contractor who also holds the specialty trade licenses — roofing, mechanical, plumbing, electrical — can submit consolidated permit packages rather than waiting on separately licensed subs to pull their own permits in sequence.

In coastal ZIP codes throughout these two counties, projects frequently trigger additional reviews: flood-zone elevation certificates, FEMA compliance documentation for structures near the Intracoastal, and energy-efficiency calculations required under Florida's current building code cycle. Coordinating those reviews across multiple specialty contractors is where timelines slip. When the GC license and every trade license sit with the same owner, the permit path is a single conversation with the building department.

Neighborhoods from Parkland and Coral Springs in the northwest to Boca Raton and Delray Beach on the coast carry different HOA architectural review requirements on top of county permits. Aldo Dellamano's team has navigated both county systems and common HOA submission formats across these corridors, so the plan-review process does not stall the construction calendar.

What Separates a Multi-License General Contractor From a Standard GC

Most general contractors hold a single GC license and coordinate licensed subs for mechanical, plumbing, electrical, and roofing scopes. That model works, but it introduces scheduling dependencies the GC cannot fully control — a sub's inspection backlog becomes the project's inspection backlog.

Dellamano Construction holds FL #CGC1525289 (General Contractor), FL #CCC1335157 (Roofing), FL #CMC1251666 (Mechanical), FL #CFC1434398 (Plumbing), and FL #EC13015530 (Electrical) — all under Aldo Dellamano personally. Self-performing the trade scopes means the inspection schedule is an internal decision, not a negotiation with outside companies. It also means warranty questions after completion have a single point of contact rather than a chain of subcontractor agreements.

The fixed-bid proposal structure the company uses lists every line item before work begins. Change orders require written approval and exist only for scope added outside what was signed — not for costs that were simply unestimated at the start.

Common questions

Do I need a general contractor or can I hire the trades separately in Broward or Palm Beach County?
For projects that cross trade lines — any job combining structural, roofing, MEP, or significant finish work — Florida law requires a licensed GC to pull the overall permit and take code responsibility for the full scope. Hiring trades separately is legal for isolated repairs under certain thresholds, but as soon as a project involves multiple systems or requires a building permit, a GC signature is required. Attempting to owner-build across trades without the license can result in stop-work orders and failed final inspections.
How does a fixed-bid contract protect me compared to time-and-materials pricing?
A fixed-bid contract locks the total project cost at signing based on a fully itemized scope. If material costs shift or a trade scope takes longer than estimated, that variance is the contractor's problem to manage — not an addition to your invoice. Time-and-materials billing passes those variables to you. The fixed-bid model works best when the scope is defined in writing before work starts, which is why the proposal process here documents every line before a contract is signed.
What should I look for when verifying a general contractor's license in Florida?
Florida's Department of Business and Professional Regulation (DBPR) maintains a public license lookup at myfloridalicense.com where you can verify license number, status, expiration date, and any disciplinary history. For a project in Broward or Palm Beach County, confirm the GC license is current and active, and ask separately which trade scopes — roofing, mechanical, plumbing, electrical — will be pulled by the GC versus a separately licensed sub. Each sub's license should also be verifiable on the same DBPR portal.

Ready to Put the Full Scope in Writing?

Describe the project and we will schedule a prompt walkthrough and build a written fixed-bid proposal with every line itemized before anything is signed.

Call (561) 654-7243

Text Aldo Call the office